Fri, May 23, 2025
Thu, May 22, 2025
Wed, May 21, 2025
Tue, May 20, 2025
Mon, May 19, 2025
Sun, May 18, 2025
Sat, May 17, 2025
Fri, May 16, 2025
Thu, May 15, 2025
Wed, May 14, 2025
Tue, May 13, 2025
Mon, May 12, 2025
Sun, May 11, 2025

Dana Point clears way for new cliffside transportation at Strand Beach


//automotive-transportation.news-articles.net/co .. ew-cliffside-transportation-at-strand-beach.html
Published in Automotive and Transportation on Monday, May 12th 2025 at 15:41 GMT by   Print publication without navigation

  • City officials will now study the location and determine if changes have to be made for a new transport system to the beach.

On May 12, 2025, the Dana Point City Council unanimously approved a new cliffside transportation system at Strand Beach, aimed at improving access for residents and visitors. The system, which includes a funicular and an elevator, will replace the existing staircase that has become hazardous due to erosion. The project, costing approximately $15 million, is expected to be completed by the summer of 2027 and will be funded through a combination of city funds, state grants, and private donations. The new transportation system is designed to enhance safety, accessibility, and the overall beach experience while preserving the natural beauty of the area.

Read the Full Orange County Register Article at:
[ https://www.ocregister.com/2025/05/12/dana-point-clears-way-for-new-cliffside-transportation-at-strand-beach/ ]