Mon, April 28, 2025
Sun, April 27, 2025
Sat, April 26, 2025
Fri, April 25, 2025
Thu, April 24, 2025
Wed, April 23, 2025
Tue, April 22, 2025
Mon, April 21, 2025
Sun, April 20, 2025
Sat, April 19, 2025
Fri, April 18, 2025
Thu, April 17, 2025
Wed, April 16, 2025
Tue, April 15, 2025

What's next for US 67 Corridor, Centennial Bridge? Illinois, Iowa Departments of Transportation enter study phase


  Copy link into your clipboard //automotive-transportation.news-articles.net/co .. rtments-of-transportation-enter-study-phase.html
  Print publication without navigation Published in Automotive and Transportation on by KWQC
          🞛 This publication is a summary or evaluation of another publication 🞛 This publication contains editorial commentary or bias from the source


  For 85 years, the Centennial Bridge has kept the Quad Cities connected, but as the bridge ages, experts say maintenance costs keep rising and frequent repairs are no longer sustainable.

The Illinois and Iowa Departments of Transportation have initiated a study to assess the future of the U.S. 67 corridor, including the Centennial Bridge, which connects the Quad Cities. This study, expected to last 18 months, will evaluate the bridge's condition and explore potential improvements or replacements, considering factors like traffic volume, safety, and economic impact. The study will involve public input and is crucial for planning long-term infrastructure investments in the region, ensuring the corridor meets future transportation needs.

Read the Full KWQC Article at:
[ https://www.kwqc.com/2025/04/18/whats-next-us-67-corridor-centennial-bridge-illinois-iowa-departments-transportation-enter-study-phase/ ]

Publication Contributing Sources